¥ 1495.00
¥ 1495.00
¥ 1495.00
¥ 1495.00
¥ 1495.00
易卖工控网(www.ymgk.com)提供”AS-BDEP-296 使用指导全国包邮”,产品详情:品牌/厂家:、型号:AS-BDEP-296、成色:全新、货期:现货 1天内发货、保修:180天,更多产品详情就上易卖工控网。
MACS系统给用户提供的是一个通用的系统组态和运行控制平台,应用系统需要通过工程师站软件组态产生,即把通用系统提供的模块化的功能单元按一定的逻辑组合起来,形成一个能完成特定要求的应用系统。
系统组态后将产生应用系统的数据库、控制运算程序、历史数据库、监控流程图以及各类生产管理报表。下面简单了解一下系统组态流程,具体步骤如下:
(1)前期准备工作。进入系统组态前,应首先确定测点清单、控制运算方案、系统硬件配置,包括系统的规模、各站IO单元的配置及测点的分配等,还要提出对流程图、报表、历史数据库、追忆库等的设计要求。
(2)建立目标工程。在正式进行应用工程的组态前,必须针对该应用工程定义一个工程名,该目标过程建立后,便建立起了该工程的数据目录。
(3)系统组态设备。应用系统的硬件配置通过系统配置组态软件完成。采用图形方式,系统网络上连接的每一种设备都与一种基本图形对应。在进行系统设备组态之前必须在数据库总控中创建相应的工程。
Macs system provides users with a general system configuration and operation control platform. The application system needs to be generated through the software configuration of the engineer station, that is, the modular functional units provided by the general system are combined according to a certain logic to form an application system that can complete specific requirements.
After the system is configured, the database, control operation program, historical database, monitoring flow chart and various production management reports of the application system will be generated. Let's briefly understand the system configuration process, and the specific steps are as follows:
(1) Preliminary preparations. Before entering the system configuration, first determine the list of measuring points, control operation scheme and system hardware configuration, including the scale of the system, the configuration of IO units of each station and the distribution of measuring points, and put forward the design requirements for flow chart, report, historical database and memory database.
(2) Establish target project. Before the formal configuration of the application project, a project name must be defined for the application project. After the target process is established, the data directory of the project is established.
(3) System configuration equipment. The hardware configuration of the application system is completed by the system configuration software. In the form of graphics, each device connected on the system network corresponds to a basic graphics. Before system equipment configuration, corresponding projects must be created in the database master control.